AccessUM --> 2003 Proposed Projects

Priority

Bldg#

Building

Action

 Estimate

Justification

1

043

Taliaferro Hall

Installation of chair lifts, ramp, and an ADA compliant elevator.

 

 $ 112,500

These modifications are included in the scope of the $6M Taliaferro/Key Building Renovation Project which is $568,760 over budget.  Utilization of these Access UM funds would help bring the project into budget.  These modifications are required because the renovation project involves connecting the two buildings.  However, the finished floor elevations in four areas do not match.  Three chair lifts and one ramp is required for individuals with disabilities to be able to move from one building to another.  In addition, the building does not have an ADA compliant elevator.   The total cost of the ADA modifications is $930,000. 

 

048

Francis Scott Key Hall

If this project is not partially funded by the FY 2003 Access UM program, the ADA modifications will be completely funded as part of the on-going Taliaferro/Key Building Renovation Project.  However, elimination of other desired scope items would be required from that project.  Specifically, the conversion of the existing HVAC system from a two-pipe to a four-pipe configuration would not be completed on the lower three floors of the west wing.  The result is that maintenance of a redundant HVAC system would be required until the piping system was converted. 

2

077

Main Administration Building

Provide an accessible elevator.

 $ 112,500

As the facility housing the primary administrative functions for the entire University, it is important for the facility to be accessible to all faculty, staff, and students, as well as the general public.  However, currently, only the ground floor is accessible to individuals with disabilities.  This project will provide for the design of an accessible elevator providing access to the upper floors of the building.  Depending upon the Cabinet's decision on the location, the total estimated project cost is $730,000 to $900,000.  Due to the limited available funding, cost sharing is proposed over a period of four fiscal years with construction beginning in FY 2005.

3

 

Various

Emergency Funds

 $ 26,179

Funds reserved for emergent projects required to correct specific access deficiencies discovered during the year.

 

 

 

FY 2003 Funding Total

 $ 251,179

 

<-- Back to Access UM Program Home
rule

Office of the President | University of Maryland | 301.405.5803
Main Administration Building, College Park, MD 20742-5025
Designed and maintained by The Office of Human Relations Programs
Comments and questions may be directed to ohrp-commissions@umd.edu


Last modified Monday, 03-Oct-2005 16:13:19 EDT           © Tuesday, 18-Nov-2008 14:28:51 ESTUniversity of Maryland